Project Details

Purpose and Scope ….. Education.

….. objective 
Bangkok Hereinafter referred to as “partners” with the intent to hire “consultants” to provide engineering services as follows.

  1. Feasibility Study and Environmental Impact.
  2. Survey design details.
  3. Property for expropriation preliminary survey work.

By consultants to study the feasibility and detailed design of the bridge over the river at the site or nearby.

….. scope and areas of study.

………. 1. Advisor will provide a comprehensive study of the road network, Chan Road, Charoen Krung Road.Road King Rama 3 Road, Charoen Rat Road. And continuity. And feasibility study of the network traffic between the bridge and the road network.

……….. 2 consultants to study the integration with other projects in the future. In the area of ​​various departments such as ETA. Mass Rapid Transit Authority of Thailand The State Railway of Thailand, the Department of Rural Roads.

……….. 3 consultants to study the feasibility of the bridge to facilitate public or community located on the banks of the river for two traffic of vehicles and people on foot. And encourage participation in community activities around the bridge.

………. 4. Advisor will review the project and to study the suitability and feasibility of the project location. In the case study project. Not fit in the designated area. According to the resolution of the OTP. No. 4/49 on November 8, 2549.

 

…. alternative routes study program consists of the following three routes.

1. The connection to the road bridge over the Chao Phraya water occupies Chan Chan Road junction with New Road, the path is a straight line with a connection to the Charoen Nakorn Road sandalwood. The area of ​​the lumber mills of FIO (formerly Oop) of the Ministry of Agriculture. Side of the Road. Area schools Shrewbury.
Two. Appalachian Trail is located on the side of Charoen Wat Yawat. The area of the canal is public Space as a field of international schools. Shrewbury. 
, the lift bridge will stretch along New Road. Turn on Chan Road. The route is part of the Charoen Road between soi 29/1 with Cast 31.
Three. Ridge Route Road side of the property through the land. Road across the road into the side streets Chan Cast space of 
sawmill wood FIO (formerly Oop) of the Ministry of Agriculture.